Y1
1st Year Apprentice
0 XP total • 500 to next
0 solved
🌀
Chilled Water Coil Piping
HVAC / Sheet Metal
Year 3-475 XP
Assemble the chilled water piping at an AHU cooling coil from supply to return, including all required accessories.
Available Parts (tap to select, then tap a position)
Assembly Positions
Position 1: From chilled water supply
Empty
Position 2: Before control valve
Empty
Position 3: Flow regulation
Empty
Position 4: Through coil
Empty
Position 5: Flow measurement
Empty
Position 6: To chilled water return
Empty