Play/High-Rise MEP/Size It Right
Y1

1st Year Apprentice

0 XP total • 500 to next

0 solved
🏙️

Emergency Generator Capacity

High-Rise MEP

Journeyman+100 XP

Scenario

A high-rise building has the following emergency loads: fire pump at 125 HP (93 kW), two stairwell pressurization fans at 30 HP each (45 kW total), smoke exhaust fans at 50 HP (37 kW), emergency lighting and exit signs at 25 kW, fire alarm and communications at 10 kW, one elevator for firefighter service at 50 HP (37 kW), and fire command center at 5 kW. The generator must include a 25% derating factor for altitude and temperature. What minimum generator rating is required?