Fire Pump Acceptance Test
High-Rise MEP
Journeyman+100 XP
Put the fire pump acceptance test steps in the correct order per NFPA 20 and NFPA 25, from pre-test preparation through final documentation.
Drag to reorder, or use the arrow buttons.
1Run pump at churn (no-flow) condition and record churn pressure on discharge gauge
2Inspect suction supply — confirm water source is available and suction valve is fully open
3Open test header valves progressively to 100% rated flow while recording pressure at each point
4Verify fire pump room is complete — piping, valves, controller, and wiring installed per approved drawings
5Start pump manually from controller and verify rotation direction
6Verify automatic start on pressure drop — simulate low system pressure and confirm pump starts within 10 seconds
7Increase flow to 150% of rated capacity and verify pump meets performance curve
8Document all test results on NFPA 25 acceptance test form and submit to authority having jurisdiction