Play/Data Center Design/Build the Assembly
Y1

1st Year Apprentice

0 XP total • 500 to next

0 solved
🖥️

Cooling System

Data Center Design

Journeyman+70 XP

Assemble the data center chilled water cooling system from the chiller plant through the air delivery path to the hot aisle return.

Available Parts (tap to select, then tap a position)

Assembly Positions

Position 1: Cooling generation

Empty

Position 2: Fluid transport

Empty

Position 3: Heat exchange

Empty

Position 4: Air distribution

Empty

Position 5: Cold air delivery

Empty

Position 6: Warm air return

Empty