Y1
1st Year Apprentice
0 XP total • 500 to next
0 solved
🎛️
VAV Box Controller Installation
Building Controls
Year 1-250 XP
Assemble the components for installing a DDC VAV box controller, from mounting to operational verification.
Available Parts (tap to select, then tap a position)
Assembly Positions
Position 1: Physical mounting
Empty
Position 2: Power connection
Empty
Position 3: Output wiring
Empty
Position 4: Temperature input
Empty
Position 5: Airflow input
Empty
Position 6: Network connection
Empty