Y1
1st Year Apprentice
0 XP total • 500 to next
0 solved
🏭
Cooling Tower Fan Staging
Central Plant Design
Year 3-470 XP
Order the steps for properly staging cooling tower fans to efficiently meet the condenser water temperature setpoint.
Drag to reorder, or use the arrow buttons.
1Increase lead tower fan to high speed if condenser water setpoint is not met
2Enable lead tower fan at low speed to begin heat rejection
3Stage lag tower fan to low speed before pushing lead fan harder
4Verify approach temperature — condenser water leaving temp vs. outdoor wet-bulb
5Increase lag tower fan to high speed if additional capacity is still needed
6Enable VFD speed trim on all running fans to optimize energy use at partial load