Y1
1st Year Apprentice
0 XP total • 500 to next
0 solved
🏭
Chemical Feed System
Central Plant Design
Year 3-470 XP
Assemble the condenser water chemical treatment system from the chemical storage tank through the injection point and blowdown path.
Available Parts (tap to select, then tap a position)
Assembly Positions
Position 1: Chemical source
Empty
Position 2: Chemical dosing
Empty
Position 3: System injection
Empty
Position 4: Water quality monitoring
Empty
Position 5: Concentration control
Empty
Position 6: Waste discharge
Empty