Play/Central Plant Design/Build the Assembly
Y1

1st Year Apprentice

0 XP total • 500 to next

0 solved
🏭

Chemical Feed System

Central Plant Design

Year 3-470 XP

Assemble the condenser water chemical treatment system from the chemical storage tank through the injection point and blowdown path.

Available Parts (tap to select, then tap a position)

Assembly Positions

Position 1: Chemical source

Empty

Position 2: Chemical dosing

Empty

Position 3: System injection

Empty

Position 4: Water quality monitoring

Empty

Position 5: Concentration control

Empty

Position 6: Waste discharge

Empty